about
help!
rides
calendar
photos
forum
maps
recent posts
Home
»
Image galleries
»
Trails
»
Northern Beaches
»
Manly Dam
»
Trail Maintenance
Water control
Submitted by Stuart M on Sun, 18/11/2007 - 21:12.
Trail Maintenance
Digging the trench to take the water bars
EXIF Information
Date and Time (original)
Sun, 18/11/2007 - 11:35
Manufacturer
Nokia
Model
N73
Focal Length
5.6 mm
Aperture
f/2.8
Exposure Time
1/500 sec.
Flash
Flash did not fire, auto mode.
ISO Speed Ratings
100
Average:
0
Login
or
register
to post comments
Thumbnail
Inline
<prev
next>