Boardwalk realignment

Submitted by Stuart M on Sun, 18/11/2007 - 21:17.

The boardwalk from the road has been realigned here with a new drainage ditch on the left hand side

Boardwalk realignment
0

The Alchemist Final work on the berm
<prev
next>
Dreggsy's best side Water control