You are hereManly Dam update for 15 Dec

Manly Dam update for 15 Dec


hawkeye's picture

By hawkeye - Posted on 15 December 2013

Area: 
Manly Dam
Status: 
Green/Open

Dry as a dead dingo's donger.

I rode the descent to the Hydro Lab and the singletrack to Wakehust Parkway. The steeper sections from Allambie have dissolved into powder covered in loose rocks, and what used to be the line is now mostly erosion gullies.

This sectio nis now in extremely poor condition and desperately needs work and/or the new line recommended in the IMBA report to be implemented post haste.

The last roll down at 19th Hole has an alternate line forming on the right that is an improvement.

Do you have more information?

If you've ridden here lately please add a more recent report. This will be useful even if the condition is the same as updates expire after 30 days.
Please do not post comments with such information - post a new update with the link above.
Please do not update this post with such information - post a new update with the link above.

Rides by Location

Best Mountain Bike