You are hereTrail fairies wanted (Manly Dam) / Gallery / Start of trig track

Start of trig track


hawkeye's picture

By hawkeye - Posted on 20 July 2013

Looking back up-trail towards the rock atop the steep boardwalk climb.

Work done:
* Trim vegetation to right of frame (left of trail from rider perspective) to restore original trail line over iron ramp
* place rocks and fill to left of frame to build up and restore function of waterbar behind timber
* cut drains to side of trail (left of frame) to assist with water shedding and reduce fall line water flow and trail erosion
* place trimmed vegetation over filled section to discourage use of retired line and trail braiding

0
 
 
Hop fiend's picture

Have got to get down to do a lap or two of Manly Dam to see if I am actually growing some balls as a rider????

Comment viewing options

Select your preferred way to display the comments and click "Save settings" to activate your changes.
Best Mountain Bike