You are hereForums / By Discipline / Mountain (off road) / By Location / Australia / NSW / Newcastle & Hunter / Trail Completed over the Long Weekend - Part 1
Trail Completed over the Long Weekend - Part 1
Time for a few pictures of the new sections. I'll do it over two posts.
From the DH trail heading towards Frogmouth Road. This trail includes the new bridge, some fun uphill swtitchbacks (six of them) and a long flowing benched section. Its the green line on the map.
Climb up to the new bridge
The new bridge
Climb after the bridge which gets pretty close to the DH trail after the last switchback
- Login to post comments
- Bookmark & share
Tags
This comment has been moved here.
Looks great, but where is it located?
Benny
Its awaba, sorry the location must have dropped out when the post was moved.
Its the new section running just below the DH trail. 100m more to be built before it pushes through to the next fire road.